How TDIndustries Achieved a 25% Productivity Boost with Dynamics 365

Unlocking efficiency with Lean Six Sigma and innovative ERP solutions.

TDIndustries transformed its operations by reducing downtime by 30% and increasing productivity by 25% after migrating from Dynamics SL to Dynamics 365 with Lean Six Sigma methodology.

Client Overview

TDIndustries, a leader in facility services and mechanical construction, sought a more reliable ERP platform to match its growth and innovation-driven culture.

The Challenge

The company faced frequent disruptions with its Dynamics SL system, impacting operational efficiency and frustrating key stakeholders.

The Solution

  • Conducted a needs assessment using Lean Six Sigma.

  • Developed a phased migration plan to Dynamics 365.

  • Provided tailored training to ensure smooth adoption.

Implementation

  1. Planning: Identified inefficiencies and core needs.

  2. Execution: Migrated priority modules to Dynamics 365.

  3. Training: Delivered hands-on workshops to enable seamless integration.

Results

  • 30% Reduction in system downtime.

  • 25% Productivity Increase across teams.

  • Enhanced workflows and operational reliability.

Key Takeaways

A structured approach and phased implementation can transform operations, ensuring measurable improvements in efficiency and productivity.

Facing operational inefficiencies?

Contact us today to design a tailored ERP solution for your business.

Tristan Locks

Founder | Global Talent Leader | Strategy | Financial & Operations Management | Generating value by integrating strategy, talent, and data

https://www.tristanlocks.com
Previous
Previous

How BCH Insurance Achieved a 50% Faster Document Retrieval with Image Right Online